FlashSystem 5200 and 7200 Use Different Drive Codes
Midland lists AGS5 for a 4.8 TB FCM2 in the FlashSystem 5200 context and ADS5 for that capacity in the FlashSystem 7200 context. Keep the model and feature together. A similar drive description does not make every feature code interchangeable.
FlashCore Module codes by model, checked November 15, 2026
| FlashSystem model | 4.8 TB FCM2 feature | What the supplier needs |
|---|
| Array | AGS5 | Full MTM, installed feature, drive count and software level |
| Array | ADS5 | Full MTM, installed feature, drive count and software level |
For a parts order, confirm the exact part or FRU against the installed configuration. Midland also lists other capacities and feature codes in the same family table; preserve their individual model context.
How Much FlashSystem Capacity Can You Actually Use?
Multiply the drive count by the capacity per drive to get raw TB. These examples use decimal TB. They show the arithmetic, not an orderable configuration or the usable space after protection.
Two worked raw-capacity calculations
| Example | Calculation | Raw total | Still unknown |
|---|
| Array | 8 × 4.8 TB | 38.4 TB | Protection, spare capacity, metadata, snapshots and growth reserve |
| Array | 12 × 19.2 TB | 230.4 TB | Protection, spare capacity, metadata, snapshots and growth reserve |
Make the Supplier Show the Space Left for Your Data
Raw capacity is the sum of nominal drive capacities. The supplier must show the protected usable result for the actual drive layout, RAID policy, spare allocation and system overhead. Then reserve space for snapshots and growth. Keep replication capacity at the second site as a separate requirement.
Do not multiply raw TB by a marketing compression ratio and call the result usable. Effective capacity depends on the data and the vendor definition. Ask which figure is guaranteed, how it is measured and what happens when the workload compresses poorly.
Check your FlashSystem sizing requirements, then request a storage quote. Give the supplier the model and usable capacity you need. Make the proposal show how it gets there.